NASA's Artemis moon rocket makes final journey on Earth to the launchpad

The SLS and Orion spacecraft take the final journey to the launchpad ahead of the NASA's Aug. 29 Artemis 1 launch to the moon from Kennedy Space Center.

KENNEDY SPACE CENTER, Fla. – NASA's 32-story moon rocket began its last slow trip to the launchpad Tuesday night before launching the Orion spacecraft to the moon later this month.

The Space Launch System rocket and Orion spacecraft exited the Vehicle Assembly Building (VAB) at Kennedy Space Center around 10 p.m. starting the journey on a vehicle known as the Crawler Transporter 2 to launchpad 39B, about 4 miles to the east. The trip took 10 hours as the crawler moves at a cruising speed of 2 mph.

HOW TO WATCH THE ARTEMIS 1 LAUNCH ONLINE AND ON FLORIDA'S SPACE COAST

Artemis 1 Launch Director Charlie Blackwell-Thompson gave the official "go" to begin the roll on Tuesday.

The High Bay 3 doors of the VAB opened Tuesday afternoon to reveal the mobile launcher and crawler inside getting ready for the move.

The first motion of the massive moon rocket was scheduled to start around 9 p.m. However, a storm cell brought lightning within 10 miles of the space center delaying the first motion. Florida is known for its summer thunderstorms, but this particular storm was the only one for about 200 miles, and it just happened to push over Kennedy Space Center when NASA intended to start the rollout.

After 10 p.m., NASA's worm logo and the full 322-foot-tall rocket and Orion spacecraft could be seen moving away from the VAB, which has been its home during the final months of launch preparations. Thousands of people came out to KSC, arriving hours early to see the rocket's last journey on Earth.

An error occurred while retrieving the Tweet. It might have been deleted.

The crawler completed the SLS's journey to the launchpad Wednesday around 7:30 a.m. The same launch complex last hosted a liftoff to the moon in 1972 with the final Apollo mission.

Now that the Space Launch System and Orion have arrived, NASA said engineers and technicians would work to configure systems for launch.

SLS is slated to launch the uncrewed Orion spacecraft beginning the Artemis 1 mission on Aug. 29 at 8:33 a.m. The liftoff will mark the first time a rocket has launched a human-rated spacecraft to lunar orbit in 50 years.

There are many goals of this test flight, including testing Orion’s communication, navigation and guidance systems, ensuring the overall launch and performance of SLS and ensuring Orion’s heat shield can withstand Earth re-entry at 25,000 mph.

Image 1 of 16

Spectators watch as NASA's Space Launch System rocket and Orion spacecraft make the journey to Kennedy Space Center launchpad 39B on Aug. 16, 2022. (Image: Brandy Campbell/FOX Weather) ( )

Image 2 of 16

NASA's SLS rocket and Orion spacecraft leave the Kennedy Space Center Vehicle Assembly Building on Aug. 16, 2022. The Artemis-1 rocket was moved to launchpad 39B ahead of the late August launch to the moon. (Image: Emilee Speck/FOX Weather) ( )

Image 3 of 16

NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen at sunrise atop the mobile launcher as it arrives at Launch Pad 39B, Wednesday, Aug. 17, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29. Photo Credit: (NASA/Joel Kowsky) ( )

Image 4 of 16

A person takes a photo of NASA's Space Launch System rocket and Orion spacecraft making the journey to Kennedy Space Center launchpad 39B on Aug. 16, 2022. (Image: Brandy Campbell/FOX Weather) ( )

Image 5 of 16

NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Pad 39B, Wednesday, Aug. 17, 2022, after being rolled out to the launch pad at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I mission is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29. Photo Credit: (NASA/Joel Kowsky) ( )

Image 6 of 16

Spectators watch as NASA's SLS rocket and Orion spacecraft leave the Kennedy Space Center Vehicle Assembly Building on Aug. 16, 2022. The Artemis-1 rocket was moved to launchpad 39B ahead of the late August launch to the moon. (Image: Emilee Speck/FOX Weather) ( )

Image 7 of 16

People near NASA's SLS rocket and Orion spacecraft as it leaves the Kennedy Space Center Vehicle Assembly Building on Aug. 16, 2022. The Artemis-1 rocket was moved to launchpad 39B ahead of the late August launch to the moon. (Image: Emilee Speck/FOX Weather) ( )

Image 8 of 16

Spectators watch as NASA's SLS rocket and Orion spacecraft leave the Kennedy Space Center Vehicle Assembly Building on Aug. 16, 2022. The Artemis-1 rocket was moved to launchpad 39B ahead of the late August launch to the moon. (Image: Emilee Speck/FOX Weather) ( )

Image 9 of 16

NASA's SLS rocket and Orion spacecraft leave the Kennedy Space Center Vehicle Assembly Building on Aug. 16, 2022. The Artemis-1 rocket was moved to launchpad 39B ahead of the late August launch to the moon.  ( )

Image 10 of 16

NASA's SLS rocket and Orion spacecraft leave the Kennedy Space Center Vehicle Assembly Building on Aug. 16, 2022. The Artemis-1 rocket was moved to launchpad 39B ahead of the late August launch to the moon.  ( )

Image 11 of 16

NASA's SLS rocket and Orion spacecraft are seen leaving the Vehicle Assembly Building for the last time before launch. (Image: NASA) (NASA)

Image 12 of 16

NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen at sunrise atop the mobile launcher as it arrives at Launch Pad 39B, Wednesday, Aug. 17, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29. (Image: NASA) ( )

Image 13 of 16

NASA's Space Launch System rocket and Orion spacecraft make the journey to Kennedy Space Center launchpad 39B on Aug. 16, 2022. (Image: Brandy Campbell/FOX Weather) ( )

Image 14 of 16

Spectators watch as NASA's Space Launch System rocket and Orion spacecraft make the journey to Kennedy Space Center launchpad 39B on Aug. 16, 2022. (Image: Brandy Campbell/FOX Weather) ( )

Image 15 of 16

Spectators watch as NASA's Space Launch System rocket and Orion spacecraft make the journey to Kennedy Space Center launchpad 39B on Aug. 16, 2022. (Image: Brandy Campbell/FOX Weather) ( )

Image 16 of 16

  ( )

Artemis 1 Rollout forecast 

Before the giant moon rocket leaves the VAB, teams at NASA checked the forecast to ensure it was safe to move the more than 400-foot mobile launch tower and rocket across the 4-mile stretch to the pad. 

WHAT IS NASA'S ARTEMIS 1 MISSION GOING TO DO?

The SLS will not begin rollout if the forecast shows lightning chances are greater than 10% within 20 nautical miles of the launchpad. The lightning rule is the criteria that delayed the rollout at the start.

A greater than 5% chance of hail could also delay the rollout, and peak winds must be below 40 knots.

An error occurred while retrieving the Tweet. It might have been deleted.

The outside temperature is also a factor. The rollout could delay if the temperature is less than 40 degrees Fahrenheit -- which won't be a problem for August in Florida – or if it's above 95 degrees. 

Around 100,000 people are expected to travel to Florida's Space Coast to see the historic launch. If you're one of the thousands traveling to witness the launch, here is a list of possible viewing spots.

If the launch is delayed, the space agency also has Sept. 2 and Sept. 5 as backup launch dates.

While Artemis 1 will not have any humans aboard, there is one manikin and two manikin torsos loaded up the Orion spacecraft. The manikins will capture vital data for the future human crew. 

The Artemis 2 mission is expected to launch a crew of four astronauts from NASA's Kennedy Space Center to lunar orbit. Later four astronauts will launch on the Artemis 3 mission making a historic return to the moon's surface by 2025.